[email protected] Choose your country:
NR12

OBJECTIVE:

Establish basic guidelines for the implementation of control measures and preventive systems, to ensure the health and safety of workers who interact directly or indirectly in electrical installations and services with electricity.

TARGET AUDIENCE:

Professionals who work directly or indirectly with high voltage in high power systems (Primary Cabin / Transformer).

PROGRAM CONTENT

  • Organization of the Electric Power System – SEP
  • Work Organization
  • Behavioral aspects
  • Impeding conditions for services
  • Typical risks in the SEP and their prevention
  • Analysis techniques of Risk in SEP
  • Work Procedures – Analysis and Discussion
  • Working Techniques under tension
  • Signaling and isolating the work area

COURSE LOAD: 40 hours

Get to know the other training modules related to Brazilian and International Regulatory Standards (NR):